HOLD-SYSTEM®

HOLD SYSTEM, the temporary roof lifeline system.

The HOLD SYSTEM temporary lifeline is certified according to EN 795:2012 C. Overhead installation is always recommended to reduce the fall. The anchor points must withstand a minimum stress of 9 kN. The same holds for the intermediate points, which must be placed every 12 meters, if the line extends along multiple spans.

Prices and enquiries: maciej@overtheground.ie

Description

TEMPORARY HORIZONTAL ANCHORING DEVICE

HOLD SYSTEM is the temporary lifeline that can be used during construction or in other special cases. Ideal for securing two operators, it has a maximum span of 12 metres. It can be tensioned quickly and easily by a single operator using a prusik knot system and a self-locking device; the system comes complete with a carabiner and webbing for fastening.